Detention Pond Off-Peak Pumping – Pond & Drainage Canal Level Control

STORM DETENTION POND PUMPING PROJECT DETAILS

A large residential subdivision planned for Union City, California would redeveloped land previously used by an electrical power company. Due to lack of capacity in the existing storm drainage channel, a 20-million gallon stormwater detention basin was required. To drain it after storms a detention basin pumping system was needed.

Romtec Utilities designed and supplied the complete package storm water pump station for the project. Following storms the station’s two submersible pumps transfer water to the Line M drainage channel. At times when the channel is already too full to receive more water, a liquid level sensor informs the pump station to delay pumping until the channel level falls. At full power, two pumps, each producing 1581 GPM @ 24.4′ TDH, drain the detention basin @ 3100 GPM.

Click here to read about this project in Storm Water Solutions

Click here to read more in TechNotes newsletter

THIS ROMTEC UTILITIES SYSTEM INCLUDES

City specified item: MultiTrode MT2PC pump station controller
Precast concrete wet well: 6’ dia. x 28’ deep, fall & confined space entry control, pedestrian-rated hatch, pump disconnect panel
Wet well piping & accessories: all stainless steel
ITT Flygt duplex submersible pumps: NP3153 MT, 15 HP
Wet well liquid level monitoring & control: Primary – MultiTrode probe, Redundant/Back-up – MultiTrode probe w/MTR relays
Electrical generator: Cummins 50 kW trailer mounted diesel generator
Pump station electrical control panel: UL listed
Communication: Localized alarming, beacon

PDF with ADDITIONAL DETAILS

PDF with DRAWING

stormwater PREV bottom.jpg
 

Services included with every Romtec Utilities Pump/Lift Station

Free pump/lift station sizing, pump performance curve, design proposal, quotation
All pump/lift station engineering – structural, mechanical, electrical – coordination with site engineer(s)
Pumping system submittals – CAD drawings, design and materials specifications
Sewer/water regulatory agency coordination and submittal approval assistance
Factory assembly of complete pre-packaged lift stations (prefabricated pumping systems)
Coordinated delivery of complete pump station to project site
On-site construction advisor and pump station start-up services
Operation and Maintenance (O&M) manuals
On-site training of operation and maintenance personnel