Detention Pond Off-Peak Pumping – Pond & Drainage Canal Level Control
| Stormwater Lift Station | |
STORM DETENTION POND PUMPING PROJECT DETAILS A large residential subdivision planned for Union City, California would redeveloped land previously used by an electrical power company. Due to lack of capacity in the existing storm drainage channel, a 20-million gallon stormwater detention basin was required. To drain it after storms a detention basin pumping system was needed. Romtec Utilities designed and supplied the complete package storm water pump station for the project. Following storms the station’s two submersible pumps transfer water to the Line M drainage channel. At times when the channel is already too full to receive more water, a liquid level sensor informs the pump station to delay pumping until the channel level falls. At full power, two pumps, each producing 1581 GPM @ 24.4′ TDH, drain the detention basin @ 3100 GPM. Click here to read about this project in Storm Water Solutions Click here to read more in TechNotes newsletter THIS ROMTEC UTILITIES SYSTEM INCLUDES City specified item: MultiTrode MT2PC pump station controller Services included with every Romtec Utilities Pump/Lift StationFree pump/lift station sizing, pump performance curve, design proposal, quotation | |
