STORMWATER DETENTION PUMP SYSTEM PROJECT DETAILS The high water table of a new 60-unit single-family residential development requires stormwater detention areas that temporarily hold and filter water before being discharged into the nearby creek. Romtec Utilities designed and supplied a complete pumping system for controlling the water level in the detention/biofiltration area. As the water level increases, excess water drains to the pump station’s concrete wet well. A control gate can be used to limit flow to the pump station during extremely rainy periods. The duplex submersible pumps have a duty point of 880 GPM @ 12.6′ TDH. THIS ROMTEC UTILITIES SYSTEM INCLUDES Tribal agency specified items: MultiTrode MT2PC controller Precast concrete wet well: 6’ dia. x 16’ deep, fall & confined space entry control, pedestrian rated hatch Wet well piping & accessories: all stainless steel ITT Flygt submersible pumps: NP3102 LT, 5 HP Level monitoring & control: Primary – MultiTrode probe, Redundant/Back-up – MultiTrode probe w/MTR relays Auxiliary pump station power: Control panel supplied with a generator receptacle for a trailer-mounted generator Pump station electrical controls: UL listed Pump station communication/telemetry: Localized alarming, beacon PDF with ADDITIONAL DETAILS PDF with DRAWING  Services included with every Romtec Utilities Pump/Lift StationFree pump/lift station sizing, pump performance curve, design proposal, quotation All pump/lift station engineering – structural, mechanical, electrical – coordination with site engineer(s) Pumping system submittals – CAD drawings, design and materials specifications Sewer/water regulatory agency coordination and submittal approval assistance Factory assembly of complete pre-packaged lift stations (prefabricated pumping systems) Coordinated delivery of complete pump station to project site On-site construction advisor and pump station start-up services Operation and Maintenance (O&M) manuals On-site training of operation and maintenance personnel |