Romtec Utilities has opened it’s doors to a whole new side of our pump station scope of work. In March, 2010 Romtec Utilities added a construction/installation branch to our vast pump station industry. Suncadia, LLC in Cle Elum, Washington was our first construction/installation project, and a very successful first project. Suncadia Resort, with its breathtaking views of the Washington Cascades, asked Romtec Utilities to design and build a 10ft diameter by 16 1/2ft deep pump station with a valve vault and pig launcher ( for flushing objects out of the 8 inch forced main ).

Romtec Utilities’ Vice President Mark Sheldon took the opportunity to pitch the idea to have a chance at quoting the installation of these large structures. Within a week Romtec Utilities was designing and estimating the construction and installation of this project. Romtec Utilities’ engineering department worked with Suncadia’s contracted engineering firm Goldsmith, and proposed a set of drawings. One drawing was inside the work zone, which Romtec Utilities did the plans for, and the other set was outside the work zone, which Goldsmith drew up. “Inside the work zone” consists of the three concrete structures with elevations, mechanical fittings and locations, pumps, valves, pig launcher, electrical control panel, and shelter. “Outside the work zone” consisted of 8”- 12” PVC gravity sewer pipe, 8” PVC C-900 forced main pipe, and 2” CTS poly pipe with elevations, manholes, and water backflow preventer. After a couple weeks of site visits, design engineering, and estimating we were awarded the entire project.

Following the stages of pre-construction we launched into finalizing the project schedule, starting production of concrete structures, and approval of submittals. We broke ground on May 3rd, with Italics Construction as prime subcontractor and Neatline Construction as their subcontractor – diesel smoke was in the air. Twelve days later all installation and construction was completed and testing was done and approved. Overall the project was a great success, congratulations to all involved.

Related posts:

  1. Suncadia pump station installation

About Jerry Wilkison
Growing up on a Dixonville farm, Jerry Wilkison has started off his day with a hot cup of diesel for the last 25 of his 32 years of life. Jerry needs this fuel to get through the work day like sewage needs a lift station, he needs it real bad. When Jerry isn't in the field or at his desk, he spends his time working on his 1980 Subaru Brat. Powered by a 73-horsepower 1.8-liter engine, Jerry really enjoys commuting to the office, or the job site.Jerry Wilkison is Romtec Utilities' Underground Construction Manager, he has operated nearly every piece of heavy machinery known to man and has been doing since age 10. Trust Romtec Utilities and Jerry Wilkison to install your lift station.

Comments

One Response to “The Ground Has Been Broken – Suncadia”
  1. greta says:

    Nice photo!

Leave a Comment