Developers – Romtec Utilities is your hassle free answer to pump stations!
(Click Here to download .pdf)
Before the recession, Romtec Utilities built lots of pump stations for developers. Folks building pump stations these days are more often municipalities, public agencies, and private companies that need pumping systems for industrial situations. However, as the housing market regains its strength and developers start building more homes, it is highly likely that they will need pump stations. Why? Well, most of the land that “slopes” to central wastewater treatment facilities has been built on. These new developments often require some type of “lift” to get the wastewater from the homes to the treatment plant.
Romtec Utilities is the perfect answer for developers who need a pump station! We will design the complete system for free, as part of our supply. We help the developer will coordinate the pump station with the overall design of the development. How, you ask?
Romtec Utilities will work closely with the site engineer to design the pump station based on the needs of the project. We often help engineers design a system that will work with an initial flow requirement that is also easily upgraded for future increases in flow to the system. In other words, we can design systems that will service 30 homes now and 150 homes later.
Romtec Utilities will also layout our equipment on the civil engineer’s site plan. This gives everyone a “real world” look at how all of the components will fit on-site. This helps the civil engineer plan a realistic space for the pump station and any related components.
Romtec Utilities also reviews any municipal or agency requirements and helps the developer by creating a design that meets those standards. These standards can be very confusing to someone who is not familiar with pump stations.
Romtec Utilities creates a complete, comprehensive design submittal for review by the site engineer and reviewing agency. Through the review process, Romtec Utilities works diligently to receive approval in a speedy manner. We respond to written comments, in writing, within 1-3 days from receiving comments. We are always ready for a conference call to bring all parties together to solve issues and/or confusion.
Once the system is approved, Romtec Utilities works closely with the contractor to ensure that the pump station is installed correctly and efficiently. We also provide start-up services and training of the end users. Romtec Utilities’ systems include a one year warranty.
We are here for you! Our quality systems will last for decades and provide worry free service.
Related posts:

