| RESIDENTIAL SEWAGE PUMP STATION DETAILS A new residential subdivision in the western Oregon town of Monmouth would allow development of 52 lots. The project’s civil engineer determined that due to site topography, the subdivision’s sewer would terminate approximately 21′ below the nearby gravity sewer, thus requiring a sewage lift station. Romtec Utilities designed and supplied the complete wastewater pumping system for the dedicated lift station site. Romtec also advised the pump station installation contractor and provided wastewater lift station start-up and training services. A concrete building to house the sewage pump system’s control panel was supplied by Romtec. The duty point of the duplex submersible pump station is 426 GPM @ 24′ TDH. THIS ROMTEC UTILITIES SYSTEM INCLUDED City specified items: Multitrode MT2PC controller and MultiTrode MonitorPro SCADA system, auxiliary power Precast concrete wet well: 6’ dia. x 29’ deep, fall & confined space entry control, pedestrian-rated hatch Pump disconnect panel: with free-air stand, cable hatch Wet well davit crane: Thern 5124 crane w/hand winch Sanitary sewer wet well piping & accessories: all stainless steel ITT Flygt submersible pumps: NP3102 MT, 5 HP Sewer liquid level monitoring & control: Primary – MultiTrode probe; Redundant/Back-up – MultiTrode probe w/MTR relays Precast concrete valve vault: pedestrian-rated hatch, 4″ system, check & plug valves, discharge pressure gauge Pump station standby generator: Cummins 35 kW w/ATS, diesel fuel Lift station control building: 6′-8″ X 8′-8″ Romtec concrete building Pumping system controls: UL listed Telemetry: Radio SCADA and alarming system PDF with ADDITIONAL DETAILS PDF with DRAWING Services included with every Romtec Utilities Pump/Lift StationFree pump/lift station sizing, pump performance curve, design proposal, quotation All pump/lift station engineering – structural, mechanical, electrical – coordination with site engineer(s) Pumping system submittals – CAD drawings, design and materials specifications Sewer/water regulatory agency coordination and submittal approval assistance Factory assembly of complete pre-packaged lift stations (prefabricated pumping systems) Coordinated delivery of complete pump station to project site On-site construction advisor and pump station start-up services Operation and Maintenance (O&M) manuals On-site training of operation and maintenance personnel |