Transportation Flood Control – Railroad Underpass in Chicago Suburb

Stormwater Lift StationRomtec DrawingRomtec Drawing
STORMWATER COLLECTION AND PUMPING PROJECT DETAILS

Public works and railroad officials in the village of Franklin Park, Ill. had struggled for decades with at-grade railroad crossings on Grand Ave. The solution – consolidation of rail lines on a new overpass with the street crossing under – created a low spot that would have caused flooding of the street, were it not for the storm water collection/detention/pumping system that was installed along with the rail and street improvements.

Romtec Utilities worked with the project engineer to design and supply a stormwater pumping system that receives water from large – 22,000 cu. ft. – underground storage culverts to which the underpass storm drains are connected. The pump station force main discharges to a combined sewer, about 1000 feet away.

Click here to read about this project in Urban Water Management.

Click here to read more in TechNotes newsletter.

THIS ROMTEC UTILITIES SYSTEM INCLUDES

City specified items: MT2PC controller, magnetic flow meter, SCADA system, auxiliary power

Precast concrete wet well: 6’ dia. x 22’ deep, fall & confined space entry control

Pump disconnect panel: with free air stand, cable hatch

Wet well piping & accessories: all stainless steel

ITT Flygt duplex submersible pumps: NP3127 MT, 10 HP

Liquid level monitoring & control: primary – MultiTrode probe, redundant/back-up – Multitrode probe w/MTR relays, high water holdout – ITT Flygt ENM-10

Precast concrete valve vault: fall & confined space entry control, 6″ system, check & gate valves, discharge pressure gauge

Precast concrete meter vault: Siemens Mag-meter

Generator: Kohler 35 kW w/ATS, natural gas fuel, sound attenuation

Stormwater pump station controls: UL listed

Stormwater pumping telemetry: Dry contacts, owner-provided SCADA system

PDF with ADDITIONAL DETAILS

PDF with DRAWING

stormwater PREV bottom.jpg stormwater NEXT bottom.jpg

Services included with every Romtec Utilities Pump/Lift Station

Free pump/lift station sizing, pump performance curve, design proposal, quotation
All pump/lift station engineering – structural, mechanical, electrical – coordination with site engineer(s)
Pumping system submittals – CAD drawings, design and materials specifications
Sewer/water regulatory agency coordination and submittal approval assistance
Factory assembly of complete pre-packaged lift stations (prefabricated pumping systems)
Coordinated delivery of complete pump station to project site
On-site construction advisor and pump station start-up services
Operation and Maintenance (O&M) manuals
On-site training of operation and maintenance personnel